Get Your Free Quote Today!

Free Quote

Blog

This private ranch installation was designed by AMENERGY in conjunction with Peak Power Engineering. This system is the largest off grid renewable energy installation in the State of New Mexico. The power plant will supply uninterrupted power for a modern structure with large electrical demands. The design utilizes technologies never used before within the State, such as Honeywell Windtronic Wind Turbines, Sunny Multicluster Box (300A 3 Phase), and large scale concrete ground mount ballasting. The solar thermal installation provides domestic hot water preheat, offsetting propane use by 75%.

  • Off Grid Ballasted Ground Mounted
  • Solar Electric, Wind Generation,
  • Solar Thermal Installation
  • Battery Backup